What Are the Precautions for Raw Material Thawing in Aquatic Product Processing Workshops?
- Raw materials for thawing in aquatic product processing shall comply with the hygienic standard GB 2733 *Hygienic Standard for Fresh and Frozen Animal Aquatic Products*, and be sorted by variety, specification and batch, with materials with damaged packaging, thick frost or signs of repeated freezing and thawing removed.
- Refrigerated low-temperature thawing is suitable for high-demand materials such as raw edible aquatic products and premium fish fillets; materials shall be placed on elevated racks in a cold storage at 0–4°C, and the thawing cycle of whole fish or large-sized materials shall be controlled within 72 hours.
- Running-water thawing applies to small and medium-sized materials including shrimp meat, small trash fish and cut fish blocks; water temperature must be kept below 21°C, total thawing duration shall not exceed 4 hours, and immersion with sealed inner packaging is recommended.
- The critical safety limits during thawing specify that the surface temperature of raw materials shall never exceed 7–8°C throughout the process; after thawing, holding time at ambient temperature shall not exceed 30 minutes, and total temporary storage time under refrigeration at 0–4°C shall not exceed 24 hours.
- For high-histamine fish species such as mackerel, tuna and sardine, the temperature shall not exceed 5°C during the entire thawing process, while the core temperature of raw edible aquatic materials shall be controlled at 0–2°C after thawing.
Raw material thawing in aquatic product processing workshops is a core control point in the pre-treatment link, which directly affects product texture, nutrient retention and food safety, and must strictly follow the principles of low-temperature time control, hygienic isolation and quality priority. Combined with the current aquatic product processing specifications and production operation requirements, the core precautions are as follows:
01
Pre-thawing Preparation and Raw Material Control
- Thaw on demand and strictly prohibit repeated freezing and thawing
Accurately calculate the thawing amount according to the daily production plan, and prioritize the "small-batch, multi-batch" thawing mode; frozen raw materials shall not be refrozen after leaving the warehouse. Repeated freezing and thawing will damage the muscle cell structure, lead to massive loss of juice and soft and rotten taste, and significantly increase the risk of microbial reproduction.
- Raw material sorting and pre-inspection
Before thawing, sort raw materials by variety, specification and batch, and eliminate raw materials with damaged packaging, thick frost and obvious signs of repeated freezing and thawing; raw materials shall comply with the hygienic standard of GB 2733 "Fresh and Frozen Animal Aquatic Products", and indicators such as volatile basic nitrogen and histamine shall be sampled for inspection when necessary.
- Pre-disinfection of environment and tools and utensils
The thawing area is a general operation area for raw material treatment. Before each shift, tools and utensils such as thawing tanks, turnover baskets, operating tables and knives shall be cleaned and disinfected; temperature monitoring equipment shall be calibrated in advance to ensure accurate data.
02
Operation Key Points of Mainstream Thawing Methods
- Low-temperature refrigerated thawing (priority for high-grade/raw food raw materials)
Applicable scenarios: raw aquatic products, high-grade fish fillets, raw materials with high quality requirements. It is the thawing method with the least juice loss and the highest safety.
Operation requirements: Place raw materials in a 0~4℃ cold storage in an elevated position to ensure air circulation and avoid raw materials being soaked in dripping juice; the thawing cycle of whole fish/large pieces of raw materials shall be controlled within 72 hours, and the core temperature shall be monitored throughout the process.
- Air thawing (batch conventional raw materials)
Still air thawing: The ambient temperature shall not be higher than 18℃. Raw materials shall be placed in layers to avoid stacking, so as to prevent excessive local temperature rise. Pay attention to moisturizing during the process to avoid dry oxidation of the fish surface.
Flowing air thawing: The ambient temperature shall not be higher than 21℃. The thawing efficiency is improved by accelerating air circulation through fans, and the temperature of the fish body shall not be higher than 7℃ throughout the process.
- Running water thawing (fast turnover scenarios)
Applicable scenarios: Small and medium-sized raw materials that need to be thawed in a short time, such as shrimp kernels, small trash fish and divided fish blocks.
Operation requirements: The water temperature shall be strictly controlled below 21℃, keep flowing throughout the process, and the total thawing time shall not exceed 4 hours; it is recommended to soak raw materials with sealed inner packaging to prevent water-soluble nutrient loss and secondary water pollution; raw materials of different varieties and batches shall be thawed in separate tanks, and mixed placement is strictly prohibited.
- Microwave/high-frequency thawing (emergency rapid processing)
Applicable scenarios: Temporary material replenishment and small-batch urgent processing.
Operation requirements: Strictly match the raw material weight and power according to the equipment parameters to avoid local overheating and ripening; the surface temperature of raw materials after thawing shall not exceed 8℃, and they must be immediately put into the next process and shall not be stored at room temperature.
03
Core Temperature and Time Control (Safety Red Line)
- Thawing end point control
Most processing scenarios do not require complete thawing. It is sufficient to reach a semi-thawed state with the core temperature of raw materials at 0~4℃, which not only facilitates subsequent division and shaping operations, but also minimizes juice loss; for raw materials requiring complete thawing, the maximum core temperature shall not exceed 5℃.
- Upper limit of process temperature
The surface temperature of raw materials shall not exceed 7~8℃ throughout the thawing process, so as to prevent surface microorganisms from entering a large-scale reproduction state before the internal part is thawed.
- Residence time limit
After thawing, immediately enter the cleaning and division processes, and the residence time at room temperature shall not exceed 30 minutes; temporary storage shall be in a 0~4℃ environment, and the total refrigerated storage time shall not exceed 24 hours.
04
Hygiene and Cross-contamination Prevention and Control
- Area and tool isolation
The thawing area is physically separated from clean operation areas such as cooking and inner packaging areas; knives, cutting boards and containers are dedicated for raw material categories, with obvious signs, and disinfected at least once per shift to avoid cross-contamination between raw and cooked food and between different categories.
- Outer packaging prevention and control
Removing the outer packaging of frozen raw materials shall be carried out in a special area to avoid dust and pollutants on the outer packaging contacting raw materials; raw materials with damaged inner packaging shall be evaluated separately, and those with serious pollution shall be discarded directly.
- Wastewater and waste management
Wastewater generated by thawing shall be discharged in time, and the thawing tank shall be thoroughly cleaned and disinfected after each shift; waste packaging and unqualified raw materials shall be transported out of the workshop in time to avoid becoming microbial pollution sources.
05
Post-thawing Quality Control and Process Connection
- Sensory inspection
After thawing, check the color, smell and tissue state batch by batch, and eliminate unqualified raw materials that are sticky, have peculiar smell and have soft and rotten meat; green-skinned and red-fleshed fish shall be inspected emphatically for signs of histamine spoilage.
- Rapid circulation
After thawing, complete cleaning, impurity removal and division according to process requirements, and semi-finished products shall be transferred to the next process or temporarily stored at 0~4℃ as soon as possible to shorten the room temperature exposure time.
- Disposal of remaining raw materials
Unprocessed thawed raw materials on the same day shall not be frozen again. They shall be sealed and refrigerated at 0~4℃, and must be processed within 24 hours. Those exceeding the time limit shall be treated as unqualified products.
06
Special Requirements for Special Raw Materials
Fish with high histamine incidence (mackerel, tuna, sardine and other green-skinned and red-fleshed fish): Thawing must be strictly temperature-controlled, the temperature throughout the process shall not exceed 5℃, and the thawing time shall be shortened as much as possible to prevent histidine from decomposing into histamine.
Raw aquatic product raw materials: Thawing shall be carried out in the quasi-clean operation area. Operators need to change clothes twice and disinfect hands, avoid contacting raw materials with bare hands throughout the process, and control the core temperature at 0~2℃ after thawing.
Small raw materials such as shellfish meat and shrimp kernels: Adopt short-time running water thawing, and stop when reaching the semi-thawed state, so as to avoid meat fragmentation and severe water outflow caused by excessive thawing.
In the production process, thawing records of each batch shall be well made, including raw material information, thawing start and end time, ambient temperature, raw material core temperature, operators, etc., to realize full-process traceability and meet the management requirements of aquatic product production license review.
Related reading
- Slaughter Capacity to Reach 60 Million Head: How Much Room Does Hunan's 15th Five-Year Plan Leave for Equipment Suppliers?2026-11-12Industry NewsSource: 食品机械设备网
On October 31, 2026, the Hunan Provincial Department of Agriculture and Rural Affairs issued the "15th Five-Year Plan for the Development of the Livestock and Poultry Slaughter Industry in Hunan Province" (Xiang Nong Fa [2026] No. 48), proposing to "strive to build a national highland for meat processing and meat product export." The benefits for equipment enterprises are not in the slogans, but are scattered across five areas—layout, standards, intelligentization, cold chain, and deep processing—forming a demand chain of "build new plants—upgrade old plants—equip downstream." Targets First Define the Five-Year Scope. The plan's appendix lists five targets (2025→2030): annual designed pig slaughter capacity 53.85 million head→60 million head, slaughter volume above designated scale 30.07 million head→36 million head, centralized slaughter rate 49%→60%, enterprises with more than 300,000 head 21→25, meat exports 20,600 tons→25,000 tons. A net increase of 6.15 million head in designed capacity and an 11-percentage-point rise in the centralized slaughter rate mean that new line installations, exit of small sites, and upgrading of existing capacity will occur simultaneously.
- A Regulation Writes Equipment into the Rules of Jinhua Ham2026-11-10Industry NewsSource: 食品机械设备网
This year's Start of Winter has an extra layer of significance: the country's first local regulation on the ham industry, the Jinhua Ham Industry Development and Promotion Regulation, officially came into force on the same day. One clause in the regulation is particularly noteworthy for the food machinery industry: ham made with traditional techniques shall be salted with raw materials put into production between Start of Winter and Start of Spring of the following year; for production with raw materials put in at other times, modern techniques shall be adopted, with temperature and humidity controlled throughout the process. In other words, if a Jinhua ham is to be produced regardless of seasons, the premise is that the workshop must have "temperature and humidity controlled,
- Spout Pouch or Doypack: Comparison of Solutions for Russian Beverage Manufacturers Based on Use Cases, Materials, and Costs2026-11-08Industry NewsSource: Kody Packaging Editorial
Russian beverage manufacturers often face a choice between spout pouches and classic doypacks. The decision depends on the product type, logistics conditions, and end consumers' preferences.
- How to Choose Barrier Film for Juice and Beverage Manufacturers: Materials, Application Scenarios and Key Selection Criteria2026-11-07Industry NewsSource: Kody Packaging Editorial
The proper selection of barrier film directly impacts the preservation of flavor, aroma and shelf life of juices and beverages. When selecting, it is important to consider the product type, storage conditions and packaging process requirements.
Need a packaging solution for your liquid product?
Send us the volume, material and quantity. Our engineers and designers will advise you and produce free samples.
